Skip to main content

Water line work will begin May 1 in some Mammoth neighborhoods

April 2, 2014

The Mammoth Community Water District will be doing some construction this summer in an effort to replace aging water mains, thereby preventing leaks and saving water. The construction will occur in several Mammoth neighborhoods and is scheduled to start May 1 in the Majestic Pines neighborhoods, where the MCWD construction crew will be continuing to replace water service laterals. Construction should be completed in the Majestic Pines neighborhood around the end of July.

Following this project, the crews will move to the Sierra Valley Sites South neighborhood, between Dorrance Drive and Meridian Blvd. Laterals that are beyond their useful service lives will be replaced to increase water quality and reduce water losses. MCWD plans to compete construction in the Sierra Valley Sites neighborhood by October 3.

District crews will be working between the hours of 7 a.m. and 5 p.m. Please drive carefully, be alert in construction areas, and use alternative routes when possible to keep our crews safe. These construction projects improve the reliability of the water distribution system and reduce water loss in the Town of Mammoth Lakes.

If you have any questions or comments, contact Betty Hylton at 760-934-2596 ext. 274.

Connect to Mammoth Times


Like us on Facebook
 
Follow us on Twitter

 

Classified Ads

Custom Search
Premium Drupal Themes by Adaptivethemes